Dry-Dock Clearspan Project in Newport, VA
Weather-protected clearspan enclosures supporting shipboard pool-deck renovations.
During a scheduled dry-dock period in Newport, VA, JK Rentals installed two clearspan structures aboard a docked Royal Caribbean vessel. The enclosures created protected renovation zones for pool-deck upgrades, allowing crews to work steadily despite coastal weather exposure.
Project Overview
JK Rentals delivered two engineered clearspan enclosures sized at 30m x 20m and 30m x 25m, configured to function as weather-protected renovation zones on the vessel’s open deck. Scope included dry-dock delivery planning, shipboard staging coordination, and enclosure placement that preserved safe circulation for crews and materials.
The structures were sequenced to minimize disruption to surrounding trades, creating stable work zones that supported surface preparation, tooling, and material staging within a compressed dry-dock schedule.


Site Conditions & Logistics
This build took place in a dry-dock environment with restricted access, active renovation work, and strict coordination requirements across multiple trades. The top deck could only be reached by crane, with limited lift availability and tight scheduling windows shared with other contractors.
Because no part of the structure could contact the deck, traditional staking was not an option. Installation required custom rigging, precise lift coordination, and controlled placement within extremely tight clearances—less than six inches in some areas.
Build Highlights
Dry-dock projects require precision coordination and reliable protection. These shipboard clearspan enclosures created covered work zones for pool-deck renovations while supporting safe movement and efficient progress.
Crane-Lift Installation
Structures were preassembled on shore and lifted nearly 140 feet onto the vessel as complete frames, requiring precise rigging and controlled placement..
Built for Coastal Conditions
Enclosures helped reduce the impact of wind, precipitation, and temperature swings, supporting consistent work output.
Shipboard Installation Coordination
JK Rentals coordinated staging and access with the dry-dock team to support safe material movement and multi-trade schedules.
Reliable Coverage for Renovation
Protected work zones supported pool-deck renovation activities and helped maintain timelines during a compressed dry-dock window.

Challenges & Solutions
Shipboard installation introduced constraints not found on traditional job sites. With no ability to stake or rest on the deck, the team developed custom mounting and suspension methods to safely secure the structures.
Limited crane access and tight scheduling required efficient lift execution, while minimal clearances demanded careful coordination from all sides during placement. By preassembling structures on shore and planning each lift in detail, the team was able to install efficiently while maintaining safety and alignment with the broader renovation schedule.
System Additions
Marine and dry-dock projects require more than cover. The right access, enclosure options, and jobsite controls help crews work safely and efficiently in confined, high-traffic environments.

Planning a complex jobsite enclosure outside the usual footprint?
JK Rentals supports construction teams with clearspan structures built for real conditions, including tight logistics and high-coordination environments like dry-dock projects. Tell us what you are renovating, the footprint you need protected, and your access constraints, and we will help plan the structure and add-ons to keep work moving.